Warehousing, Logistics & Material Handling

Hellmann and Exotec to automate Siemens' Nuremberg warehouse

Nadia AlvarezNovember 26, 20265 min read1 views

At a glance

  • The partners plan to introduce autonomous storage, order fulfilment and material movement at the Siemens Smart Infrastructure Buildings site, with go-live scheduled for mid-2027.
  • Hellmann Worldwide Logistics is partnering with Exotec to automate storage, order fulfilment and material movement at Siemens' Nuremberg site, where Hellmann has run the warehouse since 2025. The system is planned for mid-2027 with about 35,000 initial storage locations and flexible room to scale.
Autonomous robots move totes toward picking stations in a conceptual automated warehouse, illustrating the planned Nuremberg logistics system.

Siemens Smart Infrastructure Buildings’ Nuremberg site will add intelligent robotics to its operations through a new logistics partnership. Hellmann Worldwide Logistics is partnering with Exotec to automate storage, order fulfilment and the movement of materials within the facility. The new system is scheduled to go live in mid-2027, and the partners position it as support for future growth and anticipated annual increases in volumes.

Hellmann has operated the warehouse at the Siemens Nuremberg site since 2025 as a full-service logistics provider for Siemens Smart Infrastructure Buildings. The automation is intended to create additional capacity for the site’s anticipated growth while improving efficiency, quality and space utilisation. Those objectives are stated by the partners; the announcement does not provide targets or measured results for any of them.

Autonomous robots will store and retrieve goods and transport totes to picking stations. The system will initially offer around 35,000 storage locations and is designed to scale as demand increases. Storage capacity and picking stations can be added flexibly and with minimal effort, according to the announcement. The planned configuration therefore combines automated movement with a layout that can be expanded in stages, although the announcement does not specify the number of robots, the phasing schedule or the size of the initial picking operation.

The Nuremberg site is part of Siemens Smart Infrastructure Buildings’ portfolio of buildings that can dynamically manage their own energy demand and generation. Siemens says this is achieved through a bi-directional energy flow between on-site generation and storage systems and the outside electrical grid. Such a smart building can manage energy supply and demand to help eliminate energy waste and reduce greenhouse gas emissions. The logistics announcement does not quantify how the robotics system might affect those energy or emissions outcomes.

Daniel Schnuck, director global warehouse at Siemens Smart Infrastructure, said the new automation solution would create a foundation to support future growth, continuously improve operations and ensure a consistently flexible and high level of service for customers over the long term. The project remains planned rather than operational; the mid-2027 go-live date and the initial storage capacity are among the concrete implementation details disclosed in the announcement.

Reported by Nadia Alvarez, Warehouse Automation and Safety Editor.